Ivanpah Valley Airport is a planned government relief airport for Harry Reid International Airport in the Las Vegas Valley, to be located in the Ivanpah Valley of the Mojave Desert, within Clark County, Nevada.

Ivanpah Valley Airport
  • IATA: none
  • ICAO: none
Summary
ServesLas Vegas
LocationJean and Primm
Coordinates35°41′20.15″N 115°21′35.26″W
Map
Ivanpah Valley Airport
Location within Nevada
Ivanpah Valley from northbound I-15. The new airport would be built on the right side of this photo
Ivanpah Valley from northbound I-15. The new airport would be built on the right side of this photo

Since there is only limited space left for expansion at Harry Reid, due to being located adjacent to the Las Vegas Strip, a new airport is the only alternative to increase capacity by a significant amount. The project has been on hold since June 2010.[1] The planned location for the airport is approximately 5 miles southwest of Jean Airport. It is not known whether the Jean Airport will have to be closed if the new airport is opened. However, this would be likely due to the runways lining up and the interference between the small general aviation aircraft and commercial jets.


History


Legislation was signed on October 28, 2000, allowing the Clark County Commission to purchase land for a new commercial airport.[citation needed] The Commission was to buy 6,500 acres (2,600 ha) of land in the Ivanpah Valley from the Bureau of Land Management, about 30 miles (48 km) southwest of Harry Reid International Airport for the Ivanpah Airport. The location is between the towns of Jean and Primm.

The airport had been planned to open in 2017.[2] However the Clark County Department of Aviation announced the project was put on temporary hold as of June 2010 due to the Great Recession, until air traffic and tourism demands to Metro Las Vegas returns and increases.[1]

As of mid-2018 it was planned that the environmental impact study would last at least two more years.[3] That meant that construction was guaranteed not to begin until at least 2020.


Construction


Clark County Department of Aviation had hoped to start construction in 2010 and to open the facility in 2017. These dates were based on Harry Reid reaching 90% (49.5 million passengers) of its projected capacity of 55 million passengers in 2017, it actually had 48.5 million.[4] At that time, Harry Reid was expected to be at 55 million passengers in 2011.[5] The economic recession of 2007-2010 has slowed demand considerably in the Las Vegas region and as a result, planning for the airport has slowed. The federal environmental review process has been temporarily suspended and planning has slowed as well.

Most recently the project was working to meet the lengthy environmental studies required for major projects. The engineering consultant firm Vanasse Hangen Brustlin, Inc. was chosen as the firm to help prepare the Environmental Impact Statement for the airport.[6]


Access to airport


The location designated for the airport is between the towns of Jean and Primm, Nevada, and between Interstate 15 and the Union Pacific; this leaves a gap of approximately 1.3 miles (2.1 km) for the construction of the airport. The Interstate 15 right-of-way is expected to be used by the private Brightline West (formerly DesertXpress and XpressWest) high-speed rail line, purchased by Brightline in 2018.[7] While no intermediate stops are planned, the railroad partnered with the airport authority in 2020 to ensure rail and flight operations and constructions would not conflict.[8]

The also stalled California–Nevada Interstate Maglev line to connect Las Vegas with California was to terminate at the new airport.


References


  1. Choate, Alan (June 11, 2010). "Ivanpah Airport in a holding pattern". Las Vegas Review-Journal. Retrieved 2015-04-29.
  2. Stutz, Howard (February 13, 2007). "Nevada Landing about to sink". Las Vegas Review-Journal. Retrieved 2007-03-26.
  3. "2nd major airport could be coming near Vegas". KTNV. 2018-09-20. Retrieved 2019-01-20.
  4. Akers, Mick (2018-02-05). "What upgrades are cleared for takeoff next at Las Vegas airport? - VEGAS INC". vegasinc.lasvegassun.com. Retrieved 2019-01-20.
  5. "Vision2020: What happens when demand at McCarran exceeds 53 million passengers?". McCarran International Airport. Archived from the original on 2004-02-03. Retrieved 2007-07-27.
  6. Mueller, Chuck (November 29, 2005). "Proposed Las Vegas Airport Stirs Environmental Concerns". The San Bernardino Sun. Retrieved 2015-04-29.
  7. "Brightline to Build Express Intercity Passenger Rail Connecting Southern California and Las Vegas" (Press release). XpressWest. September 18, 2018. Retrieved September 19, 2018.
  8. Akers, Mike (21 July 2020). "Clark County backs plan for state to issue bonds for high-speed rail line". Las Vegas Review-Journal. Retrieved 24 July 2020.





Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии