avia.wikisort.org - Helicopter

Search / Calendar

The Sikorsky S-73[1] was a proposed aircraft design to meet the United States Army requirement in 1970 for a Heavy Lift Helicopter (HLH) capable of carrying 45,000 lb (20,000 kg; 20 t), a lifting capacity more than twice that of Sikorsky's most powerful helicopter at that time.

S-73 HLH
Role Heavy-lift cargo helicopter
National origin United States
Manufacturer Sikorsky Aircraft
Developed from CH-54 Tarhe

The Sikorsky's S-73 design was an enlarged version of the successful CH-54/S-64 with a simplified and improved single main rotor powered by three General Electric TF34-58 turboshaft engines rated at a combined 21,000 hp (15,660 kW). A crew of five would operate the aircraft from the forward cockpit with pushbuttons replacing the traditional cyclic stick and collective lever. Behind the cockpit an aft cabin provided capacity for 12 combat troops.[2][3]

Sikorsky submitted their design in February 1971, then in May the Army declared the Boeing Vertol XCH-62 winner of the contract, ending the Sikorsky S-73 program.[2]


Specifications


Data from Sikorsky Archives[2]

General characteristics


See also


Related development

Aircraft of comparable role, configuration, and era

Related lists


References


  1. XCH-62 Heavy Lift Helicopter (HLH)
  2. Art Linden (June 2013). "Heavy Lift Helicopter, HLH". www.sikorskyarchives.com. Sikorsky Archives. Retrieved 21 May 2017.
  3. McKenna, John (2010). Skycrane: Igor Sikorsky's Last Vision. AIAA. p. 106. ISBN 978-1600867569.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии