Rajkot Greenfield International Airport (IATA: RAJ, ICAO: VAHS) is an international airport and a greenfield airport currently under construction at Hirasar, Gujarat, India,[3] which will serve the city of Rajkot and the Saurashtra region. It is being constructed near the National Highway 8B (NH-8B) connecting Ahmedabad and Rajkot. It is planned as a single runway airport for the operation of ‘C’ category aircraft.[4]
Rajkot Greenfield International Airport | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
Summary | |||||||||||
Airport type | Public | ||||||||||
Owner | Airports Authority of India | ||||||||||
Serves | Rajkot and Saurashtra | ||||||||||
Location | Hirasar | ||||||||||
Opened | April 2023 (expected)[1] | ||||||||||
Coordinates | 22°23′17″N 71°01′42″E | ||||||||||
Maps | |||||||||||
![]() ![]() RAJ Location in Gujarat Show map of Gujarat![]() ![]() RAJ RAJ (India) Show map of India | |||||||||||
![]() | |||||||||||
Runways | |||||||||||
|
The airport is being developed by the Airports Authority of India (AAI) at a cost of ₹2,654 crore (US$330 million).[5]
The site clearance approval for the airport was granted by the Government of India in May 2017. Prime Minister Narendra Modi presided over the groundbreaking ceremony held on 7 October 2017. The Union ministry of Environment, Forest and Climate change (MoEF) accorded environmental clearance (EC) to the project on 10 October 2017.[6]
Land acquisition issues delayed the tendering process by a few months.[7] Afcons, Dilip Buildcon, Gayatri Projects, Larsen & Toubro and Reliance Infrastructure were among the bidders for the Engineering, procurement, and construction (EPC) tender floated by AAI. The financial bids were opened on 9 August 2018 and Dilip Buildcon emerged as the lowest bidder. The Cabinet Committee on Economic Affairs gave its approval for the project on 28 February 2019.[8] Subsequently, in March 2019, Reliance Infrastructure was awarded the EPC contract worth ₹648 crore (US$81 million) to construct the airport. The construction is to be completed within 30 months.[9] The contract also requires the contractor to provide operation and maintenance services for a period of two years following the commissioning of the project.[4] The Central Government had initially sanctioned ₹1,405 crore (US$180 million) for the project,[10] but revised the amount in June 2019 to ₹2,654 crore (US$330 million).[5] [11]
The airport will be capable of handling Airbus A380, Boeing 747 and Boeing 777[12] [13] type of wide body aircraft and will have a rainwater harvesting system, solar power system and a green belt along its periphery to act as a noise barrier.
The airport, measuring 2,534 acres (10.25 km2), will be situated 36 km from the existing Rajkot Airport, whose capacity is constrained and cannot be expanded because of commercial development around it.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|