King Khalid International Airport (Arabic: مطار الملك خالد الدوليMaṭār al-Malik Khālid al-Duwaliyy, IATA: RUH, ICAO: OERK) is located 35 kilometres (22mi) north of Riyadh, Saudi Arabia,[3] designed by the architectural firm HOK, and Arabian Bechtel Company Limited served as the construction manager on behalf of the Saudi government.
International airport serving Riyadh, Saudi Arabia
This airport consists of five passenger terminals (only three of which are in use), with eight aero-bridges each, a mosque, covered and uncovered car parking for 11,600 vehicles, an additional Royal Terminal (for the kingdom's guests, government heads, and Saudi royal family use), a central control tower (one of the world's tallest), and two parallel runways, each 4,260 metres (13,980ft) long. Formerly the largest airport in the world in terms of ground area, the land area allocated for KKIA is the second-largest in the world, after King Fahd International Airport.[4] The airport is managed and operated by Riyadh Airports Company. The Royal Mosque was designed with a significant programme of integral art; the stained glass, by British architectural artist Brian Clarke, was a landmark work in the history of the medium, considered to be the largest and technically most advanced stained glass project of the modern period.[5]
History
King Khalid International Airport (KKIA),designed by architectural practice Hellmuth, Obata & Kassabaum,[6] was opened by HRH King Fahd on 16 November 1983, and opened for scheduled flights on 5 December of the same year. Until then, what is now Riyadh Air Base served commercial flights to and from Riyadh. Increased international and local air transport requirements for Riyadh made the change necessary. Riyadh Air Base, which is much closer to the city center, is operated by the Royal Saudi Air Force.
This airport was an alternative landing site for NASA's Space Shuttle.[7]
Structure and facilities
Terminals
Passenger terminals
Domestic Departure gate
There are five main passenger terminals at the airport, four of them were built when the airport started operation in 1983, and terminal 5 was opened in 2016.
Terminal 1 is used for all international flights (except those operated by Saudia and Middle East Airlines, which are Skyteam members and Flynas).
Terminal 2 is used by all international flights for SkyTeam members, including Saudia, and Flynas.
Terminal 3 is closed for renovations. It was used to service all Saudia and Flynas domestic flights until Terminal 5 was opened for operation.
Terminal 4 is unused, having never been utilized since construction, and remains without air bridges. Now it is under development which will last for five years.[8]
Terminal 5 is the newest terminal opened in 2016, which is now used by Saudia and Flynas for domestic flights.
Terminal 1 to 4 were built when the airport was opened in November, 1983. They are connected to each other by means of three linking buildings, each 168 metres (551ft) long. Each terminal is triangular in plan, with a base of 47,500 square metres (511,000sqft) area. The complex includes a modern VIPs terminal plus restaurants, cafeterias, airlines offices, government departments, hotels and rent-a-car companies counters, banks, first aid clinics and commercial shops.
Terminal 5 is a 106,500 square metres (1,146,000sqft) rectangular building which can serve 16 narrow-body or 8 wide-body aircraft. Operated by Irish airport operator Dublin Airport Authority, it is Saudi's first privately run airport terminal and can handle 12 million passengers per year.[9]
The Royal Terminal
The US Secretary of Defense Robert Gates walks with U.S. Ambassador to Saudi Arabia James Smith after arriving at King Khalid International Airport.
Heads of state and other high-ranking VIP visitors to the kingdom are greeted in the Royal Pavilion. The Royal Pavilion has open spaces, garden areas, and fountains. A ceremonial hall 12.5 metres (41ft) wide and 390 metres (1,280ft) long connects it to the mosque. The design and geometry of the building are similar to those of the other terminals architecturally and in the aesthetic respect. Arriving guests can use either air bridges or escalators to enter the building from the aircraft parking area. The ceremonial area on the airside has space for special receptions involving honor guards and bands. Like the passenger terminals, the Royal Pavilion has a triangular plan, with a roof composed of 33 arched sections rising to a high point 30 metres (98ft) above the ground level. Glass walls and windows illuminate the interior of the building.
General aviation terminal
A general aviation complex has been constructed north of runway number 1 for use by private aircraft and is reached by a special access road which runs north from the airport access highway. The general aviation facility includes a passenger terminal, aircraft parking and maintenance facilities, taxiways and parking for visitors, tenants and staff. In addition to privately owned aircraft, this facility accommodates Saudia's special flight services group. It's also home to Alsalam Aircraft Company, Ltd. Programmed Depot Maintenance (PDM) on Royal Saudi Air Force aircraft is performed at the uniquely designed facility.
Expansion
This article needs to be updated. (November 2022)
In July 2014, German construction company Hochtief won the bid for the airport expansion which aims at increasing its capacity from 15 million to 25 million and includes construction of a new fifth terminal.[10] The contract was valued at €1.3 billion and will be carried out by Hochtief with a 55% stake, along with Indian engineering company Shapoorji Pallonji Mideast and Saudi Arabian construction company Nahdat Al Emaar. Construction is expected to be completed by May 2019.[11] Terminal 4 is expected to be equipped with required facilities. KKIA has not witnessed any development since its establishment in 1983.
The airport will be linked with the city's new metro system, and the GACA has reached an agreement with Riyadh Development Authority for the purpose. The metro system will help passengers reach the city center quickly and comfortably, adding that spots have been allocated in the project for the metro lines. Saudi Railway Company will construct the main railway station on the southeastern part of the airport to be linked with the terminal through the metro system.
The Royal Mosque
King Khalid Airport Mosque in Riyadh
The Royal Mosque is set within a plaza in a central position in the airport. KKIA was the first airport in Saudi Arabia to be built to then-contemporary engineering standards and the mosque was at the time of its construction the most modern mosque in the world, notable for its use of advances in construction and engineering to create a modern complex in a vernacular Arabic style, and for its programme of integral art, at that time the largest in the world,[12] marrying traditional Islamic decorative elements[13] with, and interpreted through, the work of contemporary artists.[14][15] Hexagonal in plan, and enclosing an area of over 60,000 sq ft, its scale, location and design make it the most dominant building in the passenger complex.[16] The mosque can accommodate 5,000 worshippers inside,[17] with capacity for an additional 4,000 in the surrounding plaza.[3] The mosque's dome, 33 metres (108ft) in diameter and internally clad in polished bronze,[18] is internally separated from the lower roof of the building by a seven-foot clerestory ring of stained glass windows, below which runs a calligraphic mosaic band designed by Iranian-Armenian painter Edman Ayvazyan. The hand-cut glass and marble mosaic, measuring 250 sq metres and fabricated with Clarke's assistance, was the largest in the world at the time,.[19] The dome's apex, at 40 metres (130ft) above the arrivals level roadway, is higher than all the other structures in the passenger complex with the exception of the control tower and minaret. At the time of its construction, the programme of decorative and integral art[20] for the mosque constituted one of the largest single art projects of the period. In the northeast corner of the mosque plaza, a minaret rises 39 metres (128ft) above the plaza level. A spiral stairway inside the minaret provides access to loudspeakers that broadcast the prayer calls five times daily. There are 5,030 square metres (54,100sqft) of floor space on the main floor of the mosque and another 765 square metres (8,230sqft) on the mezzanine floor. A Koranic library off of the main mosque floor has 50 square metres (540sqft) of user space and the same amount for storage space. The library, private offices and lavatories are located along the southeast on the southwest walls.
Stained glass
In 1982, through the Vesti Corporation, the British architectural artist Brian Clarke was commissioned to conceive of a scheme of stained glass artworks for the interior of the Royal Mosque. Clarke made a study of Islamic ornament at the Quran schools in Fez and Tangiers for six weeks, and produced a series of abstract designs that engaged with historical pan-Islamic decorative tradition. Completed in 1982 and containing 2,000 square metres of stained glass, the Royal Mosque was considered to be the largest and technically most advanced stained glass project of the modern period, requiring the full staff of 4 stained glass factories and 150 craftsmen, taking a year to fabricate.[21] The technical demands of the designs required the revival of certain traditional manufacturing techniques, the development of new ones to accommodate the programme of ornate geometric leading, and the deployment of modern technologies and materials, including screenprinting[22] and the acid-etching of float glass.
This section does not cite any sources. (November 2022)
Centrally located in the passenger terminal complex, between the Royal Pavilion and the mosque is the air traffic control tower standing at 81 metres (266ft) high. Twr Freq. 118.6E & 118.8W. GND 121.6. CD 121.8. Riyadh Dept. 120.0 Riyadh Approach 126.0
There are 19 separate floor levels in the tower, including the operations area at the base of the tower and a total of 1,230 square metres (13,200sqft) of floor space. Six of the 19 floors are considered main floors. These include the operational level at the base of the tower, two equipment floors, an observation floor, a service floor and the cab floor at the top of the tower from which the air traffic controllers overlook the entire airport. The operations floor houses the radar control center for the airport as well as conference rooms, offices and a training area. The two equipment level contain mechanical and electrical equipment and cables, and the service floor contains a kitchen, lounge and lavatories for personnel on duty in the cab. The cab itself contains controller operating positions and electronic and communications equipment. The tower is supplied with two sources of standby power should the regular source of power be interrupted. Once source is the standby power supply at the central power plant – three diesel engine generators. In addition, a 300-kilowatt diesel engine located in the tower itself can provide a secondary source of emergency power. The tower is outfitted with the most advanced electronic radar systems and data processing equipment available.
Inter-terminal connectivity
Passengers going from one terminal to another at King Khalid International Airport can utilize moving sidewalks for transportation. The moving walkways, the first to be installed at any Saudi airport, are located in the three link buildings that connect the international and domestic terminals.
There is a total of 1,196 metres (3,924ft) of the walkways, which are actually wide conveyor belts which operate at floor level and move at a speed of close to 1 metre per second (2.2mph). Additional passenger conveniences in the terminal complex include 80 elevators and escalators. In the parking garages, 16 escalators are provided, and two serve the mosque.
The elevators, escalators and moving walkways all have the latest safety equipment installed. Should a fire occur, the elevators would automatically be recalled to the main floors and the doors opened. The escalators and moving sidewalks are equipped with fire and smoke detectors which will cause them to stop automatically should a fire be detected.
Airbridges
An airbridge connected to an Airbus A320.
KKIA was the first airport in the Kingdom to install airbridges, to speed up handling and turnaround times. Each terminal has eight gates with airbridges effectively eliminating the need for bus journeys between the terminal buildings and waiting aircraft.
Landscaping
KKIA has more than 500,000 square metres (5,400,000sqft) of landscaping. Over 225,000 trees, vines, shrubs and ground cover plants were used to landscape the airport site and the interior courtyards. A factor in the landscape design was the limited availability of irrigation water. All of the plants selected for the site are tolerant of heat, wind and dry soil conditions. Wherever possible, plants with a history of successful growth in the Riyadh area or similar environments were selected.
Safety
This facility has five separate fire houses, with several modern firefighting vehicles, and trained firefighters. The location also has security equipment and a security force.
Parking facilities
Two large three-level garages have been constructed directly in front of the passenger terminals, one on either side of the airport mosque. They are connected to the terminals and to the mosque by pedestrian walkways under the arrivals level roadway. The design capacity of the garages is 11,600 vehicles. The garages are built of cast-in-place concrete, and each covered level is 4 metres (13ft) high. Escalators and elevators are available in these garages, as well as stairways between the different levels.
Bucharest (begins 9 January 2023), Budapest (begins 9 January 2023), Catania (begins 18 April 2023), Larnaca (begins 17 April 2023), Milan–Malpensa (begins 20 April 2023), Naples (begins 18 April 2023), Rome–Fiumicino (begins 6 December 2022), Sofia (begins 20 April 2023), Venice (begins 20 April 2023), Vienna (begins 13 December 2022)
Annual passenger traffic at RUH airport.
See Wikidata query.
Statistics for King Khalid International Airport
Year
Total passengers
Total Aircraft movements
1998
8,055,000
70,909
1999
8,234,000
73,336
2000
8,411,000
74,945
2001
8,737,000
75,535
2002
9,045,000
75,623
2003
9,168,000
74,600
2004
9,911,000
77,327
2005
10,573,000
84,555
2006
11,017,000
94,250
2007
11,783,000
112,210
2008
11,540,000
114,429
2009
12,674,000
127,666
2010
13,616,000
129,613
2011
14,898,000
135,757
2012
17,069,000
153,533
2013
18,585,000
161,314
Accidents and incidents
On 27 July 2010 at 11:38 local time, Lufthansa Cargo Flight 8460, an MD-11 registered D-ALCQ, crashed upon landing at the airport and was damaged beyond repair in the ensuing fire. The Pilot in command and the First Officer – the only two persons on board – were injured.[76][77][78]
Schmertz, Mildred F. (March 1984). "The King Khaled International Airport Riyadh, Saudi Arabia". Architectural Record: 112–125.
Middle East Economic Digest. Vol.27. Middle East Economic Digest Limited. 1983.
Sinclair, Susan (2012). Bibliography of Art and Architecture in the Islamic World: Supplements to the Index Islamicus. Brill. ISBN9789004170582.
Moor, Andrew (1990). Le vitrail dans l'architecture contemporaine[Contemporary Stained Glass] (in French). Italy: Éditions Herscher. pp.44, 77. ISBN2-7335-0183-6.
Geodex Structural Information Service. W. Norup. 1984.
Hutt, Anthony (1983). Arab Architecture: Past and Present. Royal Institute of British Architects, Arab-British Chamber of Commerce. University of Durham: Centre for Middle Eastern & Islamic Studies, University of Durham. p.1983.
J., Graham. "A modern statement in Islamic art". Arts & the Islamic World. 2 i: 17–20.
Clarke, Brian; Foster, Norman; Frantz, Susanne K. (1998). "Personal Story of a Gothic Modernist". Brian Clarke: Projects. New York: Art Data/Tony Shafrazi Gallery. ISBN1891475134.
Moor, Andrew (1994). Contemporary Stained Glass: A Guide to the Potential of Modern Stained Glass in Architecture (3ed.). United Kingdom: Mitchell Beazley. ISBN9781857324372.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025 WikiSort.org - проект по пересортировке и дополнению контента Википедии