avia.wikisort.org - Aeroplane

Search / Calendar

The Junkers Ju 89 was a heavy bomber designed for the Luftwaffe prior to World War II. Two prototypes were constructed, but the project was abandoned without the aircraft entering production. Elements of its design were incorporated into later Junkers aircraft.

Ju 89
Junkers Ju 89 in flight
Role Heavy bomber
Manufacturer Junkers
First flight 11 April 1937
Introduction 1938
Retired 1939
Status Retired
Primary user Luftwaffe
Number built 2

Development


From the very beginnings of the Luftwaffe in 1933, General Walther Wever, the chief of staff, realised the importance that strategic bombing would play in any future conflict. A Langstrecken-Grossbomber ("long-range big bomber") was needed to fulfill this role.

Under the Ural bomber programme, he began secret talks with two of Nazi Germany's leading aircraft manufacturers - Dornier and Junkers - requesting designs for a long-range bomber. The two companies responded with the Dornier Do 19 and the Junkers Ju 89, respectively, and the Reichsluftfahrtministerium (RLM) ordered prototypes for both aircraft in 1935. The RLM request asked for two prototypes and a prototype series of nine aircraft.

The Ju 89 and its competitor, the Dornier Do 19, both proved promising, but fell victim to a change of direction within the Luftwaffe. Wever was killed in a plane crash in 1936. His successors – Albert Kesselring, Ernst Udet, and Hans Jeschonnek – favoured smaller, tactical aircraft, since they could be used to support army operations; they also did not require as much material and manpower. They were proponents of the dive bomber (Ju 87 Stuka) and the doctrine of close support and destruction of the opposing airforces on the battle-ground rather than through attacking enemy industry.

They convinced Hermann Göring by emphasising the need for tactical bombers to act in an army support role. Albert Kesselring, Wever's successor, believed that what Germany required were more fighters and tactical bombers.

Also Kesselring and Jeschonnek had suggested to Göring that it would be better to drop heavy bomber projects due to material shortages. Around 2.5 tactical bombers could be built with the same material as one heavy bomber. In May 1937 Göring is reported as saying to Erhard Milch ‘The Führer does not ask me how big my bombers are, but how many there are’ [1]

While these beliefs seemed validated by Germany's early successes in the Blitzkrieg, the lack of strategic bombing capability severely hampered the Luftwaffe in the Battle of Britain and Operation Barbarossa.[opinion]


First prototype


On 11 April 1937, the Ju 89 prototype D-AFIT (V1, c/n 4911) was first flown by Hesselbach. Just 2½ weeks after the first flight, on 29 April 1937, the further development of both strategic bombers was cancelled by the RLM. The reason for this step was the high fuel consumption of heavy bombers, as well as because a large number of bombers could only be manufactured if these bombers were medium bombers, like the Ju 88.


Second prototype


Junkers completed the second Ju 89 prototype D-ALAT July 1937. Junkers used both prototypes for extensive flight tests to get experience of the stability and flight controls of large aircraft, but the third prototype V3 was stopped after the programme was cancelled.

On 4 June 1938, Junkers achieved a new payload/altitude world record with the second prototype D-ALAT with 5,000 kg (11,000 lb) payload at an altitude of 9,312 m (30,551 ft), (4,000 m (13,000 ft) more than a Short Stirling with the same payload). On 8 June 1938, D-ALAT reached an altitude of 7,242 m (23,760 ft) with 10,000 kg (22,000 lb). In late 1938, both aircraft were transferred to the Luftwaffe, where they were used as heavy transport aircraft.

Both Ju 89 prototypes seem to have been scrapped by the end of 1939, although some sources claim that they were still in use the following year in Norway. During testing, Luft Hansa expressed an interest in an airliner to be developed from the type, which led Junkers to rebuild the incomplete third prototype as the Ju 90.


Specifications (Ju 89 V2)


Data from The warplanes of the Third Reich[2]

General characteristics

Performance

349 km/h (217 mph; 188 kn) at sea level

Armament
(proposed)


See also


Related development

Aircraft of comparable role, configuration, and era

Related lists


References


  1. Irving, D (1973) The Rise and Fall of the Luftwaffe, P 54 London: Cox and Wyman ISBN 0 297 76532 9
  2. Green, William (1972). The warplanes of the Third Reich (1st ed.). London: Doubleday. pp. 483–484. ISBN 0385057822.



На других языках


[de] Junkers Ju 89

Die Junkers Ju 89 war ein viermotoriger Bomber des deutschen Herstellers Junkers Flugzeug- und Motorenwerke. Er flog erstmals im April 1937. Nach einem Strategiewechsel im Reichsluftfahrtministerium wurden jedoch nur zwei Prototypen gebaut.
- [en] Junkers Ju 89

[fr] Junkers Ju 89

Le Junkers Ju 89 était un prototype de bombardier lourd quadrimoteur réalisé en Allemagne dans l’entre-deux-guerres. Il ne déboucha pas sur une production en série.

[it] Junkers Ju 89

Lo Junkers Ju 89 fu un bombardiere pesante quadrimotore ad ala bassa ed impennaggio bideriva sviluppato dall'azienda aeronautica tedesca Junkers Flugzeug- und Motorenwerke AG nei tardi anni trenta e rimasto alla fase di prototipo.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии